REQUIRED LIVE ACCEPTANCE TESTS
1. Verify four independent operation statuses persist across refresh.
2. Log in as Big Crane and Small Crane; each can upload photo 1 and 2, but not 3, and cannot edit mast placement.
3. Log in as Yard; can upload photo 3, change mast rack A–I/slot 1–12/side, edit mast and cradle notes; cannot upload photo 1 or 2 or change crane notes.
4. Administrator can edit all three photo slots and all notes.
5. Test all 184 boats and 199 image links; compare changes made since October 8 before go-live.
6. Test three photos side-by-side on iPhone/iPad, zoom and framing.
7. Confirm server response before green SAVED; test failed network save and retry.
8. Test at least 12 simultaneous devices and recovery after refresh.